Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 148: 1996-040-00 EXP MID-C COHO O&M
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
56662 REL 148
Contract Title:
1996-040-00 EXP MID-C COHO O&M
Contract Continuation:
Previous: Next:
56662 REL 125: 1996-040-00 EXP MID-C COHO O&M/M&E
Contract Status:
Closed
Contract Description:
This contract period from Feb. 1, 2018 through April 30, 2019 would continue programmatic objectives for the coho reintroduction program. Duties to include primary O&M activities such as acclimation, adult collections and spawning and early egg incubation in both the Methow and Wenatchee basins. Other actions are included as well (e.g.- carcass out planting, etc.) but are part of these overarching program goals and objectives. Modifications to the 2018 calendar year of events is that the Methow program will continue to prepare for a transition to the NPIP phase, which will require approximately double the adult collections for spawning which should have occurred in fall '17 (for 1 M juvenile production for release in 2019). This was supposed to have happened in the previous contracting period but due to insufficient adult returns, increase will be delayed for the second straight year. This had been originally scheduled for 2018 releases for Methow NPIP but with the delays of 8mile (SUP through USFS) and poor adult returns, YN had to make the determination to delay a year to maintain project integrity for all releases during NPIP to occur simultaneously. The Wenatchee program continues to work through the BDPII phase of the program and will look to repeat project-specific studies to try and determine if a contingency can be implemented if adults are unable to ascend Tumwater Canyon at the rate required to meet BDPII objectives.
CR activities to include: Pre-smolt hauling through ODFW subcontract, fish rearing/acclimation, broodstock collection, spawning, incubation, transportation of eyed eggs to LCR facilities, facility oversight/operations, annual non-technical production reporting (both in WEN and MET but also to include rearing summaries through USFWS subcontracting).
Account Type(s):
Expense
Contract Start Date:
02/01/2018
Contract End Date:
04/30/2019
Current Contract Value:
$777,421
Expenditures:
$777,421

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Rachel Castilleja Yakama Confederated Tribes No Administrative Contact casr@yakamafish-nsn.gov (509) 865-5121x6337
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Eric McOmie Bonneville Power Administration Yes COR ermcomie@bpa.gov (503) 230-4964
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Interested Party murk@yakamafish-nsn.gov (509) 548-2206
Jackie Olney Yakama Confederated Tribes Yes Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6311
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Gregory Wolfe Yakama Confederated Tribes Yes Technical Contact wolg@yakamafish-nsn.gov (509) 881-0674


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain environmental compliance B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 01/31/2019 01/31/2019
Continue to develop operation plans and protocols C: 174. Hatchery Operations and Facility Plans 01/31/2019 01/31/2019
Conduct and document maintenance, repair and dredging activities D: 61. O&M for maintenance of facilities 01/31/2019 01/31/2019
Manage and administer project, February 1, 2018 through January 31, 2019 E: 119. Manage and Administer 2018-2019 Project for Mid Columbia Coho Restoration 04/30/2019 04/30/2019
Acclimated smolts released F: 176. Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2016) 06/01/2018 06/01/2018
Acclimated smolts released G: 176. Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2016) 06/15/2018 06/15/2018
Acclimated smolts released H: 176. Acclimation/Release: Wenatchee: Butcher pond (BY 2016) 06/15/2018 06/15/2018
Acclimated smolts released I: 176. Acclimation/Release: Wenatchee: Coulter pond (BY 2016) 06/15/2018 06/15/2018
Acclimated smolts released J: 176. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2016) 04/30/2018 04/30/2018
Acclimated smolts released K: 176. Acclimation/Release: Methow: Wolf Creek Pond (BY 2016) 06/01/2018 06/01/2018
Acclimated smolts released L: 176. Acclimation/Release: Methow: Twisp Ponds (BY 2016) 05/01/2018 05/01/2018
Acclimated smolts released M: 176. Acclimation/Release: Methow: Winthrop NFH BC (BY 2016) 05/01/2018 05/01/2018
Acclimated smolts released N: 176. Acclimation/Release: Methow: Gold Creek Pond (BY 2016) 06/01/2018 06/01/2018
Collection of 2018 Coho Broodstock: Wenatchee and Methow programs O: 66. Trap 2018 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and LNFH 01/15/2019 01/15/2019
Spawn 2017 brood coho at Leavenworth NFH P: 176. Spawn 2018 brood coho at Leavenworth NFH 12/10/2018 11/27/2018
Spawn 2018 coho broodstock at Winthrop NFH Q: 176. Spawn 2018 brood coho at Winthrop NFH 12/15/2018 11/20/2018
Carcass distribution for BY2018 broodstock R: 44. Carcass dispersal of a portion of 2018 broodstock in the Wenatchee and Methow River programs 01/15/2019 01/15/2019
Transport 2018 BY eyed coho eggs to rearing facilities S: 66. Transport 2018 brood eyed-eggs from incubation facilities to rearing facilities 01/20/2019 01/20/2019
Completed Annual Report U: 132. Annual Progress report for CY17 period (1/1/17 through 12/31/17) 04/30/2019
Completed Annual Report V: 132. Annual Progress report for CY16 period (2/1/16 through 1/31/17) 03/31/2018 03/31/2018
BY 2017 coho smolts transported W: 66. Transport BY 2017 juveniles in 2019 04/30/2019 04/10/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 11 instances of WE 176 Produce Hatchery Fish
  • 3 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2018
B 165 Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 02/01/2018
C 174 Hatchery Operations and Facility Plans
D 61 O&M for maintenance of facilities
E 119 Manage and Administer 2018-2019 Project for Mid Columbia Coho Restoration 02/01/2018
F 176 Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2016) 02/01/2018
G 176 Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2016)
H 176 Acclimation/Release: Wenatchee: Butcher pond (BY 2016) 02/01/2018
I 176 Acclimation/Release: Wenatchee: Coulter pond (BY 2016) 02/01/2018
J 176 Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2016) 02/01/2018
K 176 Acclimation/Release: Methow: Wolf Creek Pond (BY 2016)
L 176 Acclimation/Release: Methow: Twisp Ponds (BY 2016)
M 176 Acclimation/Release: Methow: Winthrop NFH BC (BY 2016) 02/01/2018
N 176 Acclimation/Release: Methow: Gold Creek Pond (BY 2016) 02/01/2018
O 66 Trap 2018 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and LNFH
P 176 Spawn 2018 brood coho at Leavenworth NFH 02/01/2018
Q 176 Spawn 2018 brood coho at Winthrop NFH 02/01/2018
R 44 Carcass dispersal of a portion of 2018 broodstock in the Wenatchee and Methow River programs 02/01/2018
S 66 Transport 2018 brood eyed-eggs from incubation facilities to rearing facilities 02/01/2018
T 132 Begin preparation for annual reporting of the CY18 period (1/1/18 through 4/30/19) 02/01/2018
U 132 Annual Progress report for CY17 period (1/1/17 through 12/31/17) 02/01/2018
V 132 Annual Progress report for CY16 period (2/1/16 through 1/31/17) 02/01/2018
W 66 Transport BY 2017 juveniles in 2019